Item Description
[1] Core: PC40EE25-Z, TDK or equivalent Gapped for AL of 335 nH/T2
[2] Bobbin: EE25, Vertical, 10 pin – Yih-Hwa part # YW-360-02B
[3] Magnet Wire: #30 AWG
[4] Magnet Wire: #26 AWG
[5] Triple Insulated Wire: #26 AWG.
[6] Tape: 3M # 44 Polyester web. 2.0 mm wide
[7] Tape: 3M 1298 Polyester Film, 2.0 mils thick, 8.6 mm wide
[8] Tape: 3M 1298 Polyester Film, 2.0 mils thick, 10.7 mm wide
[9] Tape: 3M 1298 Polyester Film, 2.0 mils thick, 4.0 mm wide
[10] Varnish (applied by dipping only, not vacuum impregnation)
1.Bobbin Set Up
Orientation
Set up the bobbin with its pins oriented to the left hand side.
2.Margin Tape
Apply 2.0 mm margin at the pin side of bobbin using item [6]. Match combined height of shield, primary, and bias windings.
3.WD1 Cancellation Winding
Start at Pin 1. Wind 14 bifilar turns of item [3]from left to right. Wind with tight tension across entire bobbin evenly. Cut the ends of the bifilar and
leave floating.
4.Insulation
1 Layer of tape [7] for insulation.
5.WD#2 Primary winding
Start at pin 3. Wind 28 turns of item [3] from left to right. Apply 1 Layer of tape [7] for insulation. Wind another 28 turns from right to left. Wind with
tight tension across entire bobbin evenly. Finish at Pin 1.
6. WD #3 Bias Winding
Start at Pin 4, wind 6 trifilar turns of item [5]. Wind from left to right with tight tension. Wind uniformly, in a single layer across entire width of
bobbin. Finish on Pin 2.
7.WD #4 Bias Winding
Start at Pin 2, wind 6 trifilar turns of item [5] from left to right with tight tension. Wind uniformly, in a single layer across entire width of bobbin. Finish on Pin 5.
8.Insulation
1 Layer of tape [8] for insulation.
Margin Tape Apply 2.0 mm margin at the pin side of bobbin using item [6]. Match
combined height of secondary windings.
9.WD #5 Secondary Winding
Start at Pin 8, wind 7 turns of item [5] from left to right. Wind uniformly, in a single layer across entire bobbin evenly. Finish on Pin 6.
10.Outer Insulation
3 Layers of tape [8] for insulation.
11.Core Assembly
Assemble and secure core halves using item [1] and item [9]
12.Varnish
Dip varnish using item [10] (do not vacuum impregnate)
謝謝各位啦
請各位幫忙翻譯一下吧,有關(guān)變壓器材料和繞法的一些資料
全部回復(fù)(12)
正序查看
倒序查看
項目描述
鐵芯: PC40 EE25-Z, TDK 或同等級別 AL=335nH 開氣隙
線架: EE25 直插式,10個腳 毅華 YW-360-02 B
漆包導(dǎo)線: #30號 美國線規(guī) 0.28mm
漆包導(dǎo)線: #26號 美國線規(guī) 0.4mm
三層絕緣導(dǎo)線: #26號 美國線規(guī).0.4mm
膠帶: 3M公司#44無紡膠布. 2.0 毫米寬
膠帶: 3M公司 1298 聚酯膜,0.05mm厚, 8.6 毫米寬
膠帶: 3M公司 1298 聚酯膜, 0.05mm厚,10.7 毫米寬
膠帶: 3M公司 1298 聚酯膜, 0.05mm厚, 4.0 毫米寬
先說一些!有空在說下面的工藝操作
鐵芯: PC40 EE25-Z, TDK 或同等級別 AL=335nH 開氣隙
線架: EE25 直插式,10個腳 毅華 YW-360-02 B
漆包導(dǎo)線: #30號 美國線規(guī) 0.28mm
漆包導(dǎo)線: #26號 美國線規(guī) 0.4mm
三層絕緣導(dǎo)線: #26號 美國線規(guī).0.4mm
膠帶: 3M公司#44無紡膠布. 2.0 毫米寬
膠帶: 3M公司 1298 聚酯膜,0.05mm厚, 8.6 毫米寬
膠帶: 3M公司 1298 聚酯膜, 0.05mm厚,10.7 毫米寬
膠帶: 3M公司 1298 聚酯膜, 0.05mm厚, 4.0 毫米寬
先說一些!有空在說下面的工藝操作
0
回復(fù)
@cage_wang
項目描述鐵芯:PC40EE25-Z,TDK或同等級別 AL=335nH 開氣隙線架:EE25直插式,10個腳 毅華 YW-360-02B漆包導(dǎo)線:#30號 美國線規(guī) 0.28mm漆包導(dǎo)線:#26號 美國線規(guī) 0.4mm三層絕緣導(dǎo)線:#26號美國線規(guī).0.4mm膠帶:3M公司#44無紡膠布.2.0毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,8.6毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,10.7毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,4.0毫米寬先說一些!有空在說下面的工藝操作
謝謝你啦!
vamish 是不是可以翻譯成“凡力水”呀?
vamish 是不是可以翻譯成“凡力水”呀?
0
回復(fù)
@cage_wang
項目描述鐵芯:PC40EE25-Z,TDK或同等級別 AL=335nH 開氣隙線架:EE25直插式,10個腳 毅華 YW-360-02B漆包導(dǎo)線:#30號 美國線規(guī) 0.28mm漆包導(dǎo)線:#26號 美國線規(guī) 0.4mm三層絕緣導(dǎo)線:#26號美國線規(guī).0.4mm膠帶:3M公司#44無紡膠布.2.0毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,8.6毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,10.7毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,4.0毫米寬先說一些!有空在說下面的工藝操作
另外,毅華 YW-360-02B是種怎樣的材料呢,麻煩解釋一下吧,再謝過啦
0
回復(fù)
@cage_wang
項目描述鐵芯:PC40EE25-Z,TDK或同等級別 AL=335nH 開氣隙線架:EE25直插式,10個腳 毅華 YW-360-02B漆包導(dǎo)線:#30號 美國線規(guī) 0.28mm漆包導(dǎo)線:#26號 美國線規(guī) 0.4mm三層絕緣導(dǎo)線:#26號美國線規(guī).0.4mm膠帶:3M公司#44無紡膠布.2.0毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,8.6毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,10.7毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,4.0毫米寬先說一些!有空在說下面的工藝操作
可不可以將剩下的也翻譯一下呢?很想知道.
0
回復(fù)
@cage_wang
項目描述鐵芯:PC40EE25-Z,TDK或同等級別 AL=335nH 開氣隙線架:EE25直插式,10個腳 毅華 YW-360-02B漆包導(dǎo)線:#30號 美國線規(guī) 0.28mm漆包導(dǎo)線:#26號 美國線規(guī) 0.4mm三層絕緣導(dǎo)線:#26號美國線規(guī).0.4mm膠帶:3M公司#44無紡膠布.2.0毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,8.6毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,10.7毫米寬膠帶:3M公司1298聚酯膜,0.05mm厚,4.0毫米寬先說一些!有空在說下面的工藝操作
我接著這個朋友的,說下面的工藝,小女不才,水平不是很好,如有錯的,請大家指點
1、骨架固定
方向骨架引腳向左手邊固定
2、夾帶
2.0MM的無紡布夾帶包在引腳 的一側(cè),高度第1、2、3、4、繞組
3、繞組1
1腳起始,0.28兩線并繞14T,從左繞到右邊,緊密勻均繞制,結(jié)尾雙線引出(即飛線)
4、層間絕緣: 包8.6MM膠帶1T
5、繞組2(初級繞組)
3腳起始,0.28線從左到右密繞28T,8.6MM膠帶1層絕緣,然后從右到左再密繞28T,結(jié)束在1腳.
6、繞組3
4腳起始,0.4MM三重線三根線從左到右均勻整層密繞6T,結(jié)尾2腳
7、繞組4
2腳起始,0.40MM三重線三根線從左到右均勻整層密繞6T,結(jié)尾在5腳
8、絕緣:. 一層10.7MM寬絕緣膠帶.
2.0MM的無紡布夾帶包在引腳 的一側(cè),高度第5、繞組
9、繞組5
起始8腳,0.40三重線從左到右緊密均勻繞7T,結(jié)尾在6腳
10、10.7MM膠帶繞3T
11、磁芯裝配
EE25-Z,PC40磁芯一付,緊密配合用4.0MM膠帶固定
12、絕緣漆
一般浸漆,不用真空浸漆.
不過樓主好像打印有錯誤,為什么項目4沒有用到呀
1、骨架固定
方向骨架引腳向左手邊固定
2、夾帶
2.0MM的無紡布夾帶包在引腳 的一側(cè),高度第1、2、3、4、繞組
3、繞組1
1腳起始,0.28兩線并繞14T,從左繞到右邊,緊密勻均繞制,結(jié)尾雙線引出(即飛線)
4、層間絕緣: 包8.6MM膠帶1T
5、繞組2(初級繞組)
3腳起始,0.28線從左到右密繞28T,8.6MM膠帶1層絕緣,然后從右到左再密繞28T,結(jié)束在1腳.
6、繞組3
4腳起始,0.4MM三重線三根線從左到右均勻整層密繞6T,結(jié)尾2腳
7、繞組4
2腳起始,0.40MM三重線三根線從左到右均勻整層密繞6T,結(jié)尾在5腳
8、絕緣:. 一層10.7MM寬絕緣膠帶.
2.0MM的無紡布夾帶包在引腳 的一側(cè),高度第5、繞組
9、繞組5
起始8腳,0.40三重線從左到右緊密均勻繞7T,結(jié)尾在6腳
10、10.7MM膠帶繞3T
11、磁芯裝配
EE25-Z,PC40磁芯一付,緊密配合用4.0MM膠帶固定
12、絕緣漆
一般浸漆,不用真空浸漆.
不過樓主好像打印有錯誤,為什么項目4沒有用到呀
0
回復(fù)
@lia.lee123
我接著這個朋友的,說下面的工藝,小女不才,水平不是很好,如有錯的,請大家指點1、骨架固定方向骨架引腳向左手邊固定2、夾帶2.0MM的無紡布夾帶包在引腳的一側(cè),高度第1、2、3、4、繞組3、繞組1 1腳起始,0.28兩線并繞14T,從左繞到右邊,緊密勻均繞制,結(jié)尾雙線引出(即飛線)4、層間絕緣:包8.6MM膠帶1T5、繞組2(初級繞組) 3腳起始,0.28線從左到右密繞28T,8.6MM膠帶1層絕緣,然后從右到左再密繞28T,結(jié)束在1腳.6、繞組3 4腳起始,0.4MM三重線三根線從左到右均勻整層密繞6T,結(jié)尾2腳7、繞組4 2腳起始,0.40MM三重線三根線從左到右均勻整層密繞6T,結(jié)尾在5腳8、絕緣:.一層10.7MM寬絕緣膠帶. 2.0MM的無紡布夾帶包在引腳的一側(cè),高度第5、繞組9、繞組5 起始8腳,0.40三重線從左到右緊密均勻繞7T,結(jié)尾在6腳10、10.7MM膠帶繞3T11、磁芯裝配EE25-Z,PC40磁芯一付,緊密配合用4.0MM膠帶固定12、絕緣漆一般浸漆,不用真空浸漆. 不過樓主好像打印有錯誤,為什么項目4沒有用到呀
我覺得第二項直接譯成我們行內(nèi)的術(shù)語"打擋墻"易懂些,就是線架PIN端需打2.0mm無紡布擋墻,高度與繞組平齊;
0
回復(fù)